Industrial supply from Canada. Enquiries welcome worldwide +1 437 917 9336Mon to Fri, 7 am to 5 pm ETOrder supportSign in
Industrial Supply and Engineering
Request a quote Shop
Request a quote Call

Wire preparation and termination tooling

Build a matched wire-processing brief. Bring conductor, terminal, tooling and inspection requirements together before choosing manual or automated equipment.

Conductor preparation, terminal matching and crimp inspection.
Original PRP process schematic. Confirm the actual material, part and acceptance criteria before selection.

Build the inquiry around the application

Build a wire and terminal matrix

Record conductor size and strand construction, insulation, length, terminal or ferrule type, strip requirements and the approved tool or die. Confirm whether harnesses are made in-house or purchased complete.

Choose the right level of assistance

Compare manual, powered and automated methods using actual batch size, variety, changeovers and operator work. A high catalogue output rate is not proof of an improvement on a mixed-product line.

Define acceptance

Use the terminal/tool manufacturers and customer quality requirements to establish inspection and validation. Visual appearance alone does not establish a sound crimp. Ferrules are application-dependent, not a universal requirement.

Include the supporting items

Consider spare blades/dies, consumables, marking, training, maintenance and service. Provide representative approved conductor/terminal combinations before an equipment recommendation.

Prepare a useful specification

Use these prompts for your internal review. The checkboxes are not submitted or saved. Keep confidential drawings within your approved sharing process.

Wire and terminal application checklist

Continue with the right resource

These resources support an application discussion. A selector or illustration does not approve a material substitution, tool setting or finished assembly.

What information makes a quotation useful?

Provide the specification and drawing revision, quantity, expected repeat demand, required documentation and delivery location. Confirm current cost, currency, freight, lead time and terms with the quotation.

Can we start before an exact part is chosen?

Yes. Describe the operation, current method and the priority: quality, delivery, total cost or technical support. We can identify the missing inputs for a focused application review.