Supplying plants in Canada and the United States from Mississauga +1 647 717 6264Mon to Fri, 7 am to 5 pm ETOrder supportSign in
Industrial Supply and Engineering
Request a quote
Request a quote Call

Ontario Water Explorer

Interactive Water Planning

See the system.
Test the decision.

Explore wastewater storage, stormwater response and water-network performance. Change the inputs, replay the results and compare scenarios—right here.

Ontario Water ExplorerOntario observations
Example simulations
No sign-in required
Illustrative water systems, not a surveyed map An illustrated industrial campus, community, treatment tanks and river. Select a numbered point to explore how water moves through the selected system. The terrain and networks are fictional. Wastewater sources 1Wastewater sources Equalisation storage 2Equalisation storage Treatment stages 3Treatment stages Discharge or reuse 4Discharge or reuse Rainfall inputs 1Rainfall inputs Terrain and drainage 2Terrain & drainage Runoff storage 3Runoff storage Downstream conditions 4Downstream conditions Stored water 1Stored water Pumping and energy 2Pumping & energy Distribution mains 3Distribution mains Isolation valves 4Isolation valves Fire-flow assessment 5Fire-flow assessment ILLUSTRATIVE SYSTEM · FICTIONAL TERRAIN AND ASSETS
Illustrative campus · not a surveyed mapSelect a numbered point to explore

Follow the wastewater

Start at the source, balance the tank, then see how outlet capacity changes the result. This example does not simulate treatment chemistry.

Can the tank absorb a shift?

Example day: process flow arrives from 08:00–16:00. The tank starts empty; the outlet works whenever water is available.

Total inflow—Over the modelled period
Volume sent to treatment—Does not calculate pollutant removal
Volume exceeding storage—Simulated excess, not mapped flooding
Inflow rate (m³/h), left scaleStored volume (m³), right scale
12:00
Stored at this time—

Wastewater assumptions and calculation

This is a 24-hour mass-balance model with 15-minute steps, starting with empty available storage. Process wastewater is uniform over 08:00–16:00; sanitary flow follows a normalized illustrative daily pattern; infiltration/inflow is constant. Contributions must be separate to avoid double-counting.

Each step adds inflow, sends up to the entered outlet capacity to treatment, then stores the remainder. Any volume above the tank capacity is reported as simulated excess. Total inflow = volume sent to treatment + excess + final stored volume.

It does not calculate sewer hydraulics, pump controls, treatment performance, permit compliance or an actual discharge route. Real equalization design uses measured inflow and outflow profiles across representative days. EPA flow-equalization reference.

Saved scenarios stay in this browser.

Explore Ontario · Real public observations

A map you can actually explore.

Locate river-monitoring stations, inspect terrain hillshade and replay the last 24 hours of available water-level or flow readings. No modelling-software login is needed.

Public data · No sign-in

Choose a region, then load the map. Data is fetched only when you request it.

Ontario, in context.

Explore terrain and monitoring locations. Select a station to see its actual readings.

Terrain: Natural Resources Canada MRDEM hillshade under the Open Government Licence–Canada. Hillshade is a terrain backdrop, not a flood map or a surveyed engineering model. Optional street map: © OpenStreetMap contributors.

Measured data and models serve different purposes. River observations and terrain imagery come from public agencies. The example catchment, treatment tank and water-distribution network use stated assumptions, not confidential Ontario utility models. Use them to explore sensitivity and prepare questions for a project-specific study.

Reference library, additional pump estimator & project checklist

01 / Start with the right source

Ontario data and guidance

Start with your municipality and watershed. Identify the responsible authority, then check the data and requirements for your project location.

These links open the source organisations. Check each dataset's date, coverage, units and permitted use. A current river reading, a design rainfall statistic and a modelled floodplain describe different things.

Rainfall · ECCC

Design rainfall & IDF

Find intensity–duration–frequency tables and station information for rainfall inputs.

Design statistics, not live rainfall. Record the station, period of record and release; confirm locally accepted inputs and climate allowances.

Open ECCC rainfall data ↗
River observations · Water Survey of Canada

Water levels & flows

Find Ontario gauges, recent observations, historical records and station metadata.

Recent readings can be provisional. Keep observation time, units, datum and quality flags. Observations are not forecasts.

Find a water-monitoring station ↗
Watershed contacts · Conservation Ontario

Find your local authority

Locate a conservation authority and follow its links to floodplain information and project guidance.

Use the authority for your watershed. Where no conservation authority covers the site, confirm the responsible office with the municipality or province.

Find a conservation authority ↗
Local example · Toronto and Region

TRCA floodplain viewer

Explore mapped river floodplains within Toronto and Region Conservation Authority watersheds.

Limited to TRCA coverage and riverine flooding. It does not show every urban drainage problem or define all regulated areas.

Open the TRCA viewer ↗
Elevation · Geospatial Ontario

Bare-earth terrain

Find Ontario's lidar-derived Digital Terrain Model for catchment and surface-model preparation.

Check local coverage, acquisition date, resolution and vertical datum. Terrain alone does not provide surveyed pipes, culverts or channels.

Explore Ontario terrain data ↗
Provincial reference · Ontario

Stormwater design background

Read the Stormwater Management Planning and Design Manual for runoff, water-quality and facility-planning context.

Published in 2003. Confirm current municipal and conservation-authority criteria; this reference does not establish every project's requirements.

Read the Ontario manual ↗
Provincial reference · Ontario

Drinking-water systems

Explore Ontario's design guidance for drinking-water infrastructure, including distribution systems.

Published in 2008. Municipal or regional criteria may be more stringent. Confirm project-specific pressure and fire-flow requirements.

Read drinking-water guidelines ↗
Municipal example · City of London

Municipal design criteria

See London's consultant resources for water-distribution, sewer and stormwater design documents.

These requirements apply to London. Obtain the equivalent current documents from the municipality where your project is located.

Open London consultant resources ↗

02 / Understand operating cost

Pump electricity estimator

Compare two efficiency assumptions at the same flow, head and operating hours. The starting values are illustrative, including the electricity rate.

Calculation method and limits

For water at density 1,000 kg/m³ and gravity 9.81 m/s²:

Electrical kW = 0.00981 × flow (L/s) × total dynamic head (m) ÷ combined efficiency (as a decimal)

Annual kWh = electrical kW × operating hours
Annual energy cost = annual kWh × CAD/kWh

This assumes one constant operating point. Variable demand, speed changes, multiple pumps and varying tariffs need a time-based assessment. Shutoff operation is outside this method; a pump at zero flow can still consume electricity. An efficiency of 100% is theoretical.

This tool does not select a pump, establish fire-flow capacity, calculate network pressures or optimise a system. Reference: U.S. Department of Energy pumping-system sourcebook; EPA guidance on pumping efficiency.

03 / Turn a model into a decision

Which question are you trying to answer?

Where will stormwater go?

Integrated catchment modelling can connect underground drainage, surface flow, rivers and floodplains. Compare storage, pipe upgrades and runoff controls under consistent scenarios.

Can the water network support new demand?

Pressure-network modelling can assess pressure and available fire flow using network geometry, demands, operating rules and locally agreed criteria.

What happens when an asset is unavailable?

Valve criticality and pipe-break scenarios can show service disruption and hydraulic consequences. They do not, by themselves, predict the date a pipe will fail.

Can operation improve?

Water-age, disinfectant, pump-energy and system-curve analyses can help compare operational options. Conclusions depend on suitable data and a model checked against field observations.

Tools behind the work: InfoWorks ICM supports integrated catchment modelling. InfoWater Pro works within ArcGIS Pro for water-distribution analysis. EPANET and SWMM provide publicly available modelling software and documentation. The water-network tab runs EPANET for its stated example network. The stormwater tab uses the documented conceptual model; it does not run ICM or SWMM.

04 / Prepare a useful project brief

What information do you already have?

Check what is available. Missing items help define the survey, monitoring and modelling work needed. Use the items relevant to your project; completing this list does not validate a model.

No files or network details are uploaded by this checklist or calculator. Checklist selections reset when the page is reloaded. Agree on a suitable secure transfer method before sharing utility data.

Also working in the United States?

Start with the relevant U.S. sources

NOAA precipitation-frequency data provides rainfall-frequency resources, and USGS Water Data for the Nation provides water observations. Confirm the applicable dataset version and state or local criteria for the project.

PRP Reps · Ontario first, Canada and U.S. enquiries. Independent educational and planning tools; no affiliation with Autodesk, Esri or the listed agencies. Source data can be provisional. Page prepared 29 October 2026.